FOR QUOTATION
Bill of Material in Excel or equivalent format with internal part numbers
Approved Manufacturer List (A.M.L.) - approved manufacturer name, part number, part description
Approved vendor list (preferred, not required)
Assembly Drawings
Assembly Instructions
Sample board (preferred, not required)

FOR CONSIGNMENT ASSEMBLY
All of the above plus:
Bare circuit board and/or Gerber files
Current revision sample board
X, Y or centroid data files (SMT only)
No load list if applicable

FOR TURNKEY ASSEMBLY
All of the above plus:
Gerber or CAD data file (electronic copy)
PCB fabrication drawing
Programming information for programmable devices

FOR TESTING
Schematic drawing
Net list file (electronic copy preferred)
Gold board (tested, functional, and current revision)

FOR BOX BUILD/DISTRIBUTION
All of the above plus assembly instructions for Box Build
Approved vendor list (AVL) for packaging
Artwork(s) for packaging
Customer destination shipment list
Special shipping instructions (as required)


Home Page / Corporate Background / Capability Profile / Quote Documentation Requirements
Cable & Harness Assembly / Program Management / Equipment / Employment / Contact Us

© Masterwork Electronics. All Rights Reserved.
Designed & Hosted by StarHost